Politics / Kenya

Govt Explains Gaps in Building Inspections Amid Concerns

Govt Explains Gaps in Building Inspections Amid Concerns

The State Department for Public Works has attributed gaps in building inspections across the country to inadequate funding and a shortage of essential testing equipment. 

Principal Secretary Joel Arumonyang told the National Assembly’s Committee on Housing, Urban Planning and Public Works on November 19 that the state department had been allocated Ksh5.27 billion in the proposed 2027/28 Budget Policy Statement against a requirement of Ksh11.41 billion. 

This would leave the department with a funding shortfall of Ksh6.14 billion, which officials warned could undermine construction oversight and affect the quality of project inspections, audits and supervision.

The PS added that insufficient budgetary provisions had contributed to accumulated pending bills amounting to Ksh1.521 billion, with contractual obligations continuing to exceed available allocations.

Public Works PS Joel Arumonyang appears before the National Assembly's Departmental Committee on Housing, Urban Planning and Public Works, November 19, 2026.

Photo

Parliament

The revelation comes amid increased attention on construction safety following several deadly building collapses in Nairobi within recent weeks. 

Appearing before the same committee, National Construction Authority (NCA) Acting Executive Director Susan Rutto revealed that 72 buildings had collapsed across the country in the past three years due to factors including poor supervision, substandard materials and shoddy workmanship.

She added that the authority had inspected approximately 113,000 construction projects and registered more than 15,000 others.

On November 14, a building under construction in Ngara’s Riverside area collapsed, killing several people, while another eight-storey structure near the Standard Gauge Railway (SGR) terminus along Mombasa Road partially gave way a day earlier, leaving six construction workers dead. 

The incidents came weeks after an 18-storey building collapsed along 9th Street in Eastleigh on October 23, prompting a 15-day recovery operation that ended with eight people confirmed dead.

That collapse also raised questions about the government’s oversight of construction projects after officials revealed that the building’s architectural drawings and structural plans had not received approval, despite Nairobi County having cleared an application to change the property’s use from residential to commercial-residential apartments.

The Institution of Engineers of Kenya (IEK) has since urged authorities to conduct nationwide inspections of high-risk construction sites.

Additionally, the Architects Alliance has called on President William Ruto to declare the recurring building collapses a national disaster, demanding urgent inspections of high-risk developments and a national inquiry into construction failures.

In an open letter dated November 16, the organisation proposed the formation of an independent multidisciplinary task force comprising architects, engineers and other built environment professionals to audit high-risk developments, investigate structural failures and recommend corrective measures. 

The organisation urged the President to establish the proposed task force within seven days and ensure initial safety interventions are publicly reported within 30 days.

Meanwhile, committee chairperson and Kuresoi South MP Joseph Tonui pledged to push for increased budgetary allocations for the Public Works department through its report to the Budget and Appropriations Committee, as the funding request is considered.

Rescue operations at the scene where an eight-storey building is reported to have collapsed near SGR on November 13, 2026.

Photo

SGA

Share this story WhatsApp Facebook X
Originally published by Kenyans.co.ke
View on Kenyans.co.ke

Comments 0

No comments yet. Start the conversation.

Loading the next story…