Africa / Kenya

KeNHA Announces 2-Month Traffic Disruptions Affecting Nairobi Motorists

KeNHA Announces 2-Month Traffic Disruptions Affecting Nairobi Motorists

The Kenya National Highways Authority (KeNHA) has announced a temporary traffic disruption at Lower Kabete-Ndumbuini/Kapenguria-Uthiru Interchange starting Wednesday, December 2, 2026.

The disruption, announced through a notice on Wednesday, November 25 will affect motorists using the interchange as contractors begin reconstruction works targeting its ramps, loops and slip roads.

"The Kenya National Highways Authority (KeNHA) would like to inform the public of a temporary traffic disruption following closure of Lower Kabete- Ndumbuini/ Kapenguria Road – Uthiru Interchange. This is due to scheduled road works for reconstruction of the Interchange Ramps, loops and Slip Roads, from Wednesday, 2nd December 2026 to Sunday, 31st January 2026," KeNHA stated. 

The planned works will require the closure of several access points, forcing motorists to use alternative roads when travelling between Nairobi, Ndumbuini and Uthiru, while the construction works are scheduled to run until January 31.
 

Construction workers at the Wikililye–Katulani Road site in Kitui during a KeNHA inspection, September 25, 2026.

Photo

KeNHA

The Lower Kabete-Ndumbuini and Kapenguria-Uthiru corridor has recorded several accidents, with speeding, poorly marked speed bumps and heavy pedestrian and matatu activity raising safety concerns.

Hazard areas include Kamutiini, King'eero, Lower Kabete Road and Uthiru Bridge, where residents have raised concerns over inadequate footpaths, faded road markings and pedestrian safety.

Reconstructing ramps, loops, and slip roads is expected to improve safety along the Uthiru-Kapenguria-Ndumbuini corridor by separating highway traffic from local turning movements.

Dedicated exit and acceleration lanes will allow vehicles joining or leaving Waiyaki Way to adjust their speeds, reducing sudden braking, dangerous merging and rear-end collisions.

Loop ramps are designed to eliminate risky turns across oncoming traffic, while grade-separated routes will reduce conflicts with local traffic, although pedestrian crossings and appropriate speed limits remain essential.

The roads authority has released a traffic management plan directing motorists to alternative routes to minimise inconvenience and maintain movement around the construction area.

Drivers travelling from Nairobi towards Ndumbuini can exit at Kabete Technical along Waiyaki Way and proceed towards Naivasha Road roundabout.They should then use the Uthiru Underpass, turn back onto the Nairobi-bound carriageway and access Marigioni Cabro Road towards Ndumbuini Shopping Centre.

Alternatively, motorists can exit at Leadway Petrol Station, proceed to Uthiru Underpass and rejoin the Nairobi-bound carriageway before taking Marigioni Cabro Road. Another option for Nairobi motorists is exiting at 87/Muhuri Interchange, shortly after Shell Kinoo, then using 87-Ndumbuini Road near 87 Mall.

Drivers approaching from Rironi and Nakuru should turn at Muhuri Interchange and use the Muhuri-Ndumbuini Road to reach their destinations.

Motorists travelling from Ndumbuini towards Nairobi can use Marigioni Cabro Road or Ndumbuini Road through 87/Muhuri Interchange to access Waiyaki Way.

Those proceeding towards Rironi should use the Nakuru-bound carriageway, while motorists from Uthiru and Kawangware should use Uthiru Underpass or Muhuri Interchange.

A KeNHA bridge in one of the counties, June 14, 2025.

Photo

KeNHA

Share this story WhatsApp Facebook X
Originally published by Kenyans.co.ke
View on Kenyans.co.ke

Comments 0

No comments yet. Start the conversation.

Loading the next story…