- KeNHA will close the Lower Kabete-Ndumbuini/Kapenguria-Uthiru Road Interchange from December 2, 2026, to January 31, 2027
- Motorists travelling between Nairobi, Ndumbuini, Uthiru and Rironi will use alternative routes
- The authority has issued a traffic management plan and urged motorists to follow road signs and instructions from police officers and traffic marshals
Motorists using the Nairobi-Nakuru Highway and surrounding roads have been notified of temporary traffic changes as the Kenya National Highways Authority (KeNHA) prepares to undertake reconstruction works at a busy interchange.
KeNHA has announced the closure of Lower Kabete-Ndumbuini/Kapenguria-Uthiru Road Interchange from December 2, 2026, to January 31, 2027. Photo: KeNHA.
Source: Getty Images
In a public notice dated Wednesday, November 25, KeNHA announced the temporary closure of the Lower Kabete-Ndumbuini/Kapenguria Road - Uthiru Interchange to facilitate the reconstruction of interchange ramps, loops and slip roads.
The works are scheduled to run from Wednesday, December 2, 2026, to Sunday, January 31, 2027, affecting motorists travelling between Waiyaki Way, Ndumbuini, Uthiru, Kawangware and Naivasha Road.
The authority has provided alternative routes to help motorists navigate the affected sections during the construction period.
Search option is now available at TUKO! Feel free to search the content on topics/people you enjoy reading about in the top right corner ;)
Which alternative routes should motorists use?
According to KeNHA, motorists travelling from Nairobi along the A8 (Waiyaki Way) towards Ndumbuini will have three alternative routes.
The first option involves exiting at Kabete Technical, proceeding to Naivasha Road roundabout and using the Uthiru Underpass before turning back towards Nairobi on the A8 carriageway. They will then use Marigoini Cabro Road to reach Ndumbuini Shopping Centre.
Alternatively, motorists can exit at Leadway Petrol Station, proceed to the Uthiru Underpass and follow the same route through Marigoini Cabro Road.
The third option involves proceeding to the 87/Muhuri Interchange, located after Shell Kinoo, and using the 87-Ndumbuini Road.
Motorists travelling from Rironi and Nakuru towards Ndumbuini will be required to turn at Muhuri Interchange and use the Muhuri-Ndumbuini Road.
How will traffic from Ndumbuini access Nairobi?
For motorists travelling from Ndumbuini towards the A8, KeNHA has provided two alternative routes.
They can use Marigoini Cabro Road to access the Nairobi-bound carriageway or take Ndumbuini Road towards the 87/Muhuri Interchange. Those wishing to travel towards Rironi can access the Nakuru-bound carriageway through the same interchange.
Meanwhile, motorists travelling from Uthiru and Kawangware will be required to use either the Uthiru Underpass or Muhuri Interchange for all turning movements to and from Naivasha Road.
What has KeNHA told motorists?
The authority urged motorists to follow the temporary traffic management plan and observe all road signs installed around the construction area.
It also called on road users to cooperate with police officers and traffic marshals deployed to guide traffic during the works.
"KeNHA advises motorists to follow the traffic management plan, projected road signs and cooperate with police and traffic marshalls on site," the notice signed by KeNHA Directo General Luka Kimeli read.
KeNHA said the measures were necessary to facilitate the reconstruction works while managing traffic movement around the affected interchange.

No comments yet. Start the conversation.