Africa / Kenya

KURA Announces 10-Day Road Closure in Nairobi, Gives Alternative Routes

KURA Announces 10-Day Road Closure in Nairobi, Gives Alternative Routes

The Kenya Urban Roads Authority (KURA) has announced partial closure of Gitanga Road in Kawangware for ten days starting Thursday, November 26, 2026.

Through an official notice released by KURA on November 19, the affected stretch runs between Km 0+520 and Km 0+620, a 100-metre stretch and will stay closed until 6 PM on Saturday, December 5, 2026.

Both dates are inclusive; hence, motorists will need to find other ways around the busy corridor for the entire period.

KURA says the closure will allow safe construction of a cross culvert along the road corridor.

Box Culvert images, meant to control floods and movement of water.

Photo

Hynds Pipes System

“We wish to notify the general public that a section of Gitanga Road in Kawangware area will be partially closed as from 6 AM Thursday 26th November, 2026 till 6 PM Saturday 5th December 2026, both days inclusive. The temporary closure will enable safe construction of a cross culvert that will enhance drainage along the road corridor,” KURA stated.

That drainage structure is expected to improve water flow and ease flooding problems along this stretch of Gitanga Road.

The construction of the structure is coming at a time when the country is  at the peak of its October-December short rains season, with the Kenya Meteorological Service Authority (KMSA) forecasting continued heavy rainfall across the country through November.

The department has warned of possible flash floods, riverine flooding, landslides and transport disruptions in several counties, including Nairobi, Mombasa, Kisumu, Nakuru, Kiambu, Machakos, Meru and Garissa.

Gitanga Road is typically packed during weekday morning and evening rush hours, especially near Valley Arcade and Lavington.

Traffic builds up around schools like Braeburn, offices, and shopping areas, making it a key commuter route.

Residents of Kawangware, Riruta, and Kabiria rely on it daily to reach Lavington, Kilimani, and Westlands.

Motorists heading toward Kawangware will be diverted through Macharia Road to keep traffic moving during the works.

Those going toward Nairobi or needing local access will use Naivasha Road as their main alternative.

Heavy vehicles and PSVs above 7.5 tonnes have been directed to use Naivasha Road throughout the closure period.

A pedestrian walkway will be maintained, and traffic marshals will guide motorists at barricades along the diversion points.

An undated image of the busy Gitanga Road.

Photo

Standard Digital

Share this story WhatsApp Facebook X
Originally published by Kenyans.co.ke
View on Kenyans.co.ke

Comments 0

No comments yet. Start the conversation.

Africa · Citi Newsroom · 3 days ago

Galamseyers invade Northern Ashanti Mines

Illegal miners, popularly known as galamseyers, have invaded parts of the Northern Ashanti Mines concession, including the company’s main plant site at Obenemase, the Benumasehene, Nana Fosu Gyeabour, has alleged. He sai...

Loading the next story…